The RFQ process runs from a buyer’s request for quotation to an accepted purchase order: the buyer sends a defined requirement, the supplier decides whether to bid, clarifies gaps, estimates the cost and submits a quote with its assumptions and validity, and the buyer compares quotes and places an order. The last step, checking that the purchase order matches the quote, is the one most often skipped and the one that causes the most expensive disputes.

Key points

  • An RFQ asks for a price on a defined requirement; an RFP asks for a proposal; an RFI asks for information.
  • A complete RFQ package saves days of back and forth: model, drawing revision, quantities, specs, terms, deadline.
  • Decide whether to bid before you estimate. Estimating time on jobs you will not win is a real cost.
  • Write the assumptions on the quote. They are your protection when the order differs from the request.
  • Review the purchase order against the quote before you confirm it.

RFQ, RFP and RFI

DocumentThe buyer is askingTypical use
RFI (request for information)What can you do?Building a supplier list before a project
RFP (request for proposal)How would you solve this, and at what price?Undefined or design-and-build work
RFQ (request for quotation)What will this exact thing cost?Made-to-print parts with drawings and quantities
Instant quoteWhat does it cost right now?Parts priced online from the file

For made-to-print parts the RFQ is the norm. An instant quote is the same request answered by software, and the steps below still happen, compressed into seconds or handed to a person when the request needs one.

Step 1: the buyer prepares the request

A good RFQ package removes questions before they are asked.

ItemWhy it matters to the price
3D model, such as STEPGeometry for machining time and set-ups
Drawing at a stated revisionTolerances, threads, finishes, notes
Quantities, including repeatsSet-up spread and material buying
Material specificationGrade, condition, certification
Finish and treatmentOutside processing and masking
Inspection and certificatesInspection time, reports, traceability
Delivery date, place and termsLead time, freight and who carries the risk
Commercial terms and deadlinePayment terms, validity, when the decision falls

When items are missing, suppliers either ask (slow) or assume (risky). A buyer who wants comparable quotes from several suppliers gains most from a complete package, because every supplier then prices the same thing.

Step 2: the supplier logs, acknowledges and triages

Log the request with its deadline and documents, and acknowledge it the same day with the date you expect to quote. Then decide whether to bid at all. Estimating is skilled work; time spent on jobs you will not win or should not take is time not spent on those you will.

Worked example: a weighted bid/no-bid score (example weights and scores)

CriterionWeightScore (1-5)Weighted
Fits our capability30%41.20
Chance of winning25%30.75
Likely margin20%30.60
Capacity in the requested window15%20.30
Strategic value of the customer10%50.50
Total100%3.35 of 5

With a bid threshold of 3.0, this request goes ahead, though the low capacity score says the lead time needs care. The weights and threshold are the shop’s own choice; the value is in deciding the same way every time. Track your win rate by score band to see whether the threshold is in the right place, as described in quote win rate.

Step 3: clarify

Read the model and drawing together and list every question before you send any. One message with six questions is answered faster than six messages. Typical questions:

  • The model and drawing disagree. Which revision governs?
  • A tolerance is tighter than the feature needs. Is it critical?
  • A material is specified by trade name. Is an equivalent grade acceptable?
  • The finish note is ambiguous. Which surfaces, which colour, which standard?
  • A thin wall or deep pocket will be hard to make. Would a small change be acceptable? DFM feedback here often saves the buyer more than any discount.

Record the answers against the request; they become assumptions on the quote.

Step 4: estimate

Cost the route: material, set-up, machine time, labour, consumables, outside processing, overhead, risk and margin. How to quote a manufactured part walks through the method with a full example, and lead-time pricing covers what to do when the requested date needs a rush.

Step 5: review and submit

A second person checking the quote catches the misread drawing note and the missing finish, the errors that arithmetic checks miss. Then send the quote with:

  • price per quantity, with set-up or NRE shown where it matters;
  • lead time in working days, and when the clock starts;
  • quote validity;
  • the drawing revision and specifications priced;
  • assumptions from the clarification step;
  • exclusions: what is not included, such as inspection reports or freight;
  • terms, or a reference to your standard terms.

Step 6: evaluation, negotiation and award

The buyer compares quotes on price, lead time, quality record and risk, not price alone. Expect questions, requests for alternative quantities, and sometimes a request for a best and final offer. If the requirement changes, re-quote rather than adjusting the price by feel; a new revision may change the route.

Record the outcome, won or lost, with the reason if the buyer gives one. Lost quotes are the cheapest market research a shop gets.

Step 7: from purchase order to confirmed order

When the purchase order arrives, compare it with the quote before you confirm. Quality managers often call this contract review; ISO 9001 requires a review of the customer’s requirements before a supplier commits to supply.

CheckCommon mismatch
Part number and revisionPO cites a newer drawing than the one quoted
QuantityPO quantity falls between quoted price breaks
Unit pricePrice from an older or expired quote
Material and finishDifferent grade or colour on the PO
CertificatesPO asks for paperwork the quote excluded
Delivery dateShorter than the quoted lead time
Delivery and payment termsBuyer’s standard terms differ from yours
ValidityQuote expired before the PO arrived

Resolve every difference in writing, then send an order acknowledgement. Work started on an unchecked PO is work at risk.

Where RFQs usually go wrong

ProblemWhat it costsPrevention
Quoted from the model, ignoring the drawingMissed tolerances, threads or finishesRead both together; list notes before pricing
Assumptions kept in the estimator’s headDisputes when the order differsWrite every assumption on the quote
No validity statedOld prices accepted after material costs roseState validity; re-check expired quotes
Repeat quantities not asked forSet-up priced as one-off when it repeatsAsk for annual and release quantities
No outcome recordedNo idea why quotes are lostRecord won, lost and the reason given
PO accepted without reviewWrong revision made, or unpriced paperworkLine-by-line PO check before confirming

Most of these are not estimating errors. They are gaps between the steps, where information known at one stage did not reach the next. A single record per request, holding the documents, the questions and answers, the quote and the outcome, closes most of them.

How long does each step take?

That depends on the part, the shop and the buyer, so measure your own. The useful numbers are the time from request to acknowledgement, from request to quote, and from quote to decision. If quotes routinely take days for parts the shop makes every week, the routine ones are candidates for instant pricing, leaving people for the requests that need judgement.

Quotometry handles the routine end of this process: the buyer uploads a model, sees DFM checks and a price, and orders, with requests that need a person routed to an inbox for manual review and orders delivered by signed webhook and e-mail, as described on the orders page.

Questions people ask

What should an RFQ include?

At minimum: a 3D model and a drawing at a stated revision, quantities (including likely repeat quantities), material and finish specifications, tolerances and inspection requirements, certificates needed, the delivery date and place, and the commercial terms. A deadline for responses and a named contact for questions save both sides time.

How long should a supplier take to respond to an RFQ?

As long as the buyer's deadline allows, but no longer than the work needs. A simple part with a complete package can be priced the same day; a complex assembly with drawings and special processes takes longer. Acknowledge the request quickly with a date for the quote, even if the quote itself takes days.

What is the difference between an RFQ, an RFP and an RFI?

An RFI asks suppliers for information about their capabilities, usually before a project is defined. An RFP asks for a proposal, where the supplier also suggests how to meet a need. An RFQ asks for a price on a defined requirement: the part, the quantity and the terms are fixed, and the supplier prices them.

What should I check when the purchase order arrives?

That it matches the quote: part number and drawing revision, quantity, unit price, material, finish, tolerances, certificates, delivery date, delivery terms and payment terms. Also check that the quote has not expired. Any difference should be resolved, in writing, before you confirm the order and start work.